一级毛片视频免费观看,午夜免费成人,欧美性猛烈xxxx视频少妇少,我要看特级毛片,av毛片观看,一级做a免费看,国产精品毛片在线

Welcome to Jiaozuo Libo Light Alloy Co., Ltd.

Aluminum alloy sacrificial anode

magnesium anode, zinc anode

Telephone:

0391-7588881 +8618739187123

Jiaozuo Libo Light Alloy Co., Ltd.

News

News

Contact

Phone:18739187123

hotline:0391-7588881

E-mail:970512272@qq.com

Address:Wuzhi County, Jiaozuo City, China

Industry News

Cathodic protection is adopted for buried steel pipelines

  • Author:Libo
  • Source:wwww.beijingzhixunshejizhuangxiuwang.com
  • Date:2021-06-11
  • Click:0

Buried steel pipeline using cathodic protection law pipeline integrity management implementation is inseparable from the ability, and safe and efficient operation of the smart oil and gas pipeline network. Risk assessment, internal and external testing, residual strength evaluation of defects and data points can be expected, intelligent pipeline construction will be a technical means and key technologies such as pipe analysis support. Mode of leap, will eventually change the traditional pipeline design, construction, along with the mobile Internet, Internet of things, cloud computing, artificial intelligence operation management pattern, will greatly improve pipeline data acquisition, the risk rating of a new generation of technology in the field of industrial application has become increasingly mature, China's oil and gas prices and the technology level of prevention and control, defects testing and evaluation, In the process of promoting the large-scale construction of pipeline network, the standardization and module integration management of pipeline business set foot on a new stage.


The level of automation and informatization has been continuously improved, and the "said quantity 1" has been basically realized, which has laid a solid foundation for effectively solving the problems of pipeline integrity management during the construction period. Pipeline integrity management regulations, the Chinese oil group company relying on construction pipeline integrity throughout the east gas pipeline management between China and Russia should feasibility study, preliminary design and construction drawing design, engineering to carry out the "transfer of fully digital, intelligent operation, whole life Zhou Gong, production start-up, completion inspection and acceptance process, The data generated during the pipeline construction period shall be truthfully, timely and completely entered into the data management system according to the requirements of integrity management. Data collected during the construction period include pipeline property data, environmental data, design documents, construction documents and records, evaluation reports, etc. The integrity and accuracy of pipeline basic data are highly correlated with the analysis of pipeline inspection data and risk assessment during the operation period, which directly determines the success or failure of pipeline integrity management in the whole life cycle. In the process of data collection during the construction period, data filling is not timely, incomplete and inaccurate, which directly affects the quality of data collection. At the same time, engineering quality problems are also one of the main risks of pipeline operation, resulting in accidents.


Online
聯(lián)系方式

熱線電話

18739187123

上班時(shí)間

周一到周五

公司電話

0391-7588881

新密市| 兴山县| 呈贡县| 浦北县| 二连浩特市| 洛扎县| 长汀县| 始兴县| 雷山县| 库尔勒市| 阿拉善盟| 河北区| 黎平县| 黔江区| 界首市| 庄河市| 广安市| 娄底市| 万宁市| 左权县| 锡林郭勒盟| 繁昌县| 陆良县| 水城县| 宿迁市| 潞城市| 土默特左旗| 陆丰市| 龙井市| 钦州市| 凯里市| 灵川县| 安康市| 赣榆县| 包头市| 宝坻区| 泊头市| 彭阳县| 甘泉县| 岳阳县| 泌阳县|