一级毛片视频免费观看,午夜免费成人,欧美性猛烈xxxx视频少妇少,我要看特级毛片,av毛片观看,一级做a免费看,国产精品毛片在线

Welcome to Jiaozuo Libo Light Alloy Co., Ltd.

Aluminum alloy sacrificial anode

magnesium anode, zinc anode

Telephone:

0391-7588881 +8618739187123

Jiaozuo Libo Light Alloy Co., Ltd.

News

News

Contact

Phone:18739187123

hotline:0391-7588881

E-mail:970512272@qq.com

Address:Wuzhi County, Jiaozuo City, China

Industry News

Discussion on the whole process supervision of test pile

  • Author:Libo
  • Source:wwww.beijingzhixunshejizhuangxiuwang.com
  • Date:2021-06-11
  • Click:0

Discussion on the whole process supervision


The risk control system of data life cycle management. Combined with the special equipment management system, to realize the whole process of long distance gas transmission pipeline safety regulation, pipeline enterprises should be formed in the long-term management practice the pipeline integrity management as the core based on the particularity in the long-distance pipeline in special equipment system, in the current in each construction stage of long distance gas transmission pipeline inspection and test results of original records are kept by each test unit is responsible for, Such as steel plate sampling and test analysis results, non-destructive testing negatives of pipe factory, formation process of girth welding process, girth welding non-destructive testing negatives, etc. For each construction unit, the preservation and maintenance of data and materials is a huge investment, while the operation unit in the use of these resources, but faced with the embarrassment of "no way to check up". Therefore, it is an important prerequisite for realizing the whole-process supervision of pipeline enterprises to establish a long-term mechanism for sharing these data resources so as to facilitate the risk control service during operation and operation. (2) Quality supervision in the whole process of pipeline construction, pipeline quality mainly depends on the quality of steel pipe manufacturing and on-site welding and construction quality two major links. The steel pipe manufacturing process basically realizes the whole process supervision of each link of manufacturing. In terms of field construction, with the accumulation of long distance pipeline construction experience and the improvement of technical level, the field construction quality of domestic long distance pipeline has made a qualitative leap, but the pipeline construction process is still the link with the most concentrated pipeline risk. In this regard, supervision should be strengthened in two aspects: first, risk analysis should be carried out for each construction process to determine the content and indicators of supervision. If the contact is used in the link of the dead mouth, the stress index of the strong force group of the mouth should be determined, and measures should be made to control the occurrence of the strong force group. The second is to establish effective quality supervision system, the index of the construction process have traceability, construction quality control indicators have verifiability, especially to take cover engineering process supervision link, should focus on establishing effect validation experiments, such as for directional drilling pipe exists in the process of damage, such as scratch, deformation can increase in the volume of a length to be dragged back, The appearance and mechanical properties of the redundant backhaul pipe joints were analyzed to determine the backhaul quality of the directional drill.


Online
聯(lián)系方式

熱線電話

18739187123

上班時間

周一到周五

公司電話

0391-7588881

黄山市| 吉林省| 南宫市| 如东县| 耒阳市| 磴口县| 玛纳斯县| 临猗县| 钟山县| 肃北| 贵溪市| 平昌县| 利辛县| 卓资县| 凤城市| 内黄县| 庆城县| 德令哈市| 宁津县| 涿州市| 库伦旗| 赤城县| 安新县| 新兴县| 承德市| 团风县| 东丽区| 金秀| 邓州市| 张家川| 广河县| 婺源县| 英山县| 兴和县| 来宾市| 鸡泽县| 平顶山市| 宁武县| 康马县| 大埔县| 陈巴尔虎旗|